Nordic Hat06
Wind Power Products
Wind Power Products
Traffic Pads
Traffic-Signal

Nordic Fiberglass Inc.
 PO Box 27
 Warren,  MN 56762
Ph: 218-745-5095 
Fx: 218-745-4990
E-mail:
sales
Comments


USA Flag02
Made in the USA

Nordic Logo 104
Box Pads for Oil-Filled Switchgear Installation

Box Pads for Oil-Filled Switchgear Installation:

Oil-Filled  Box Pad Installation

1. Excavate the hole approximately 4” - 6” deeper than the suggested ground sleeve burial depth.

2. Compact the soil with a back-hoe or a hydraulic tamper.

3. Add approximately 4”- 6” of gravel to the bottom of the hole. 

4. Compact by machine and level the gravel.

5. Place the box pad on the leveled gravel bed.

6. Level the box pad.

7. Back-fill with loose earth material.

8. Do not back-fill with chunks of frozen material or large rocks next to the ground sleeve.

9. Pack the back-fill material by foot tamping.

Google
Search WWW Search www.nordicfiberglass.com