Nordic Fiberglass Inc. PO Box 27 Warren, MN 56762 Ph: 218-745-5095 Fx: 218-745-4990 E-mail: salesComments
Made in the USA
Single Phase Ground Sleeve Installation:
1. Excavate the hole approximately 4” - 6” deeper than the suggested ground sleeve burial depth.
2. Compact the soil with a back-hoe or a hydraulic tamper.
3. Add approximately 4”- 6” of gravel to the bottom of the hole.
4. Compact by machine and level the gravel.
5. Place the ground sleeve into the hole.
6. Level the ground sleeve.
7. Back-fill with loose earth material.
8. Do not back-fill with chunks of frozen material or large rocks next to the ground sleeve.
9. Pack the back-fill material by foot tamping.