Nordic Fiberglass Inc. PO Box 27 Warren, MN 56762 Ph: 218-745-5095 Fx: 218-745-4990 E-mail: salesComments
Made in the USA
Single Phase Box Pad Installation
1. Excavate the hole approximately 4” - 6” deeper than the suggested box pad burial depth.
2. Compact the soil with a back-hoe or a hydraulic tamper.
3. Add approximately 4”- 6” of gravel to the bottom of the hole.
4. Compact by machine and level the gravel.
5. Place the box pad on the leveled gravel bed.
6. Level the box pad.
7. Back-fill with loose earth material.
8. Do not back-fill with chunks of frozen material or large rocks next to the ground sleeve.
9. Pack the back-fill material by foot tamping.